Equipment Modification

  • 01 Situation Analysis


    • Customer requirement confirmation
    • On site evaluation of operational effectiveness
    • Surveying and mold maintenance

  • 02 Customized Solution


    • Confirmation of renovation standards
    • Signing of technical agreement
    • Cost accounting for renovation

  • 03 Manufacturing


    • custom mold
    • Spare parts system payment
    • Factory simulation evaluation

  • 04 Debug Installation


    • On-site installation and debugging of the project
    • Acceptance of technical agreement item by item
    • operation detection

  • 05 After-sales Service


    • On-demand technical guidance
    • Long-term technical debugging support
    • 7*24 Exclusive after-sales service





Historical case

  • Saudi Arabia tube expander renovation project

  • Non-shrinkage tube expander conversion to two-unit large drop project

    Project benefits: Equipment efficiency increased by 35%, replacing manual processes, and production capacity increased by 50%.

  • Aluminum tube modification project for non-shrinkage tube expander

  • Non-shrinkage tube expanding machine renovation project

  • Expansion tube door renovation project for non-shrinkage tube expander

  • Long U machine renovation project

  • Long U-shaped machine + micro-injection oil modification project

  • Long U-shaped machine aluminum tube specification switching project

    Project benefits: multi-purpose use of one machine; upgrading equipment to produce a diverse range of specifications. (Ø 9.52、Ø 8、Ø 7、Ø 5)

  • D5 new copper tube supporting long U-shaped machine transformation

  • Long U-shaped machine belt receiving rack project: single and double belt structure


  • <<  1 2  > >>
  • Home
  • Tel
  • Products
  • Top